I just had my pool re-tiled and replastered. They retiled, notched around all fittings, acid washed, bond coated then re-plastered. We have already filled the pool and gone through an acid startup. The pool has been swimmable for about 10 days now. The plaster is very rough in many places and the contractor now says that they have to drain the pool in order to bring in an electric sander to smooth the plaster.
I am not too happy that they did such a poor job that this re-work is required but aside from that, how long should the plaster cure before draining and sanding? How will this affect the life of the plaster in general?
Any comments would be appreciated!